PLink ROI Calculator

What does downtime cost your operation?

Select the site and calculation type, then enter only the costs that apply. Optional costs begin at $0 and are excluded unless you add them.

01

Choose the calculation

Manufacturing and logistics sites use different downtime-cost structures.

Manufacturing Standard Formula (M + L + E) × H + O + R Explanation

Recommended for most manufacturing events. It includes contribution margin, idle labor, idle equipment, overtime/recovery labor, and repair or restart costs.

02

Event and operating costs

Idle labor is always included. Idle equipment is included in every formula but can remain $0.

03

Additional formula inputs

Only inputs used by the selected formula are shown.

04

PLink return assumptions

Use conservative assumptions for a more credible estimate.

How the formulas work

Manufacturing uses lost contribution margin, idle labor, idle equipment, and the recovery costs included by the selected mode.

Logistics / conveyor uses lost throughput value and can apply a bottleneck multiplier when one stop affects downstream processes, docks, or people.